
Executed a rapid-turnaround fit-out for a liaison country office in Tashkent. The scope covered precision architectural partitioning, integrated utility distribution, and refined interior finishes tailored to high-spec business operations.


Materials
Optimized for acoustic control and clean spatial zoning using high-density double-layer acoustic plasterboard and specialized double-glazed framing systems. Completed with durable acoustic ceiling solutions and high-grade carpet tiles designed for intensive daily use.
Approach
The compact floorplate required accelerated multi-discipline engineering coordination — synchronizing concealed climate control, lighting circuits, and structured cabling within restricted ceiling cavities. Precise scheduling and streamlined site logistics enabled full delivery and commissioning on a fast-track schedule.



Before
A bare, unconditioned commercial shell lacking basic partitioning, sound isolation barriers, and distribution pathways for core engineering systems.
After
A fully operational, high-spec office workspace featuring acoustic meeting areas, balanced microclimate control, and clean executive finishes.


